PEMODELAN PEMBANGKIT LISTRIK FOTOVOLTAIK YANG TERHUBUNG KE JARINGAN

Main Article Content

Agus Yogianto
Ibnu Hajar
Septianissa Azzahra

Abstract

PLTS performances as a power plant does not only convert energy, so that electricity is generated, but in the study of power systems it becomes a major element that has an important role in the study of power systems. As a power system element, the PLTS acts as an element of electricity generation in this study modeled as a PV system and connected to the network, so it must meet the requirements of the electric power network operation. Through MATHLAB / SIMULINK modeling and simulation, a 100 kW peak PLTS power plant has been modeled connected to the network. From the simulation and analysis obtained, this PLTS model shows that the connected load affects the voltage condition but does not affect the frequency. The load power factor also affects the network, namely with a lower load power factor, it affects the voltage on the network.

Downloads

Download data is not yet available.

Article Details

How to Cite
Yogianto, A., Hajar, I., & Azzahra, S. (2018). PEMODELAN PEMBANGKIT LISTRIK FOTOVOLTAIK YANG TERHUBUNG KE JARINGAN. KILAT, 7(2), 201–209. https://doi.org/10.33322/kilat.v7i2.363
Section
Articles

References

[1] Ali Keyhani, M Marwali, Min Dai, Integration of Green and Renewable Energy in Electric Power System, Wiley and Son, Inc, 2010
[2] Bogdan Gorgan dkk, 2015. PV Plant Modelling for Power System integration using PSCAD Software, University of Polytechnica of Bucharest
[3] Gfritz Schimpf, Lars E Norum, Grid connected Converters for Photovoltaic, state of the art, Ideas for Improvement of transformerless inverters, Norwegian University of Science and technology, NTNU, Norway,2008
[4] IEEE 1547.1.2015,Standard Conformance Test Procedures for equipment interconnecting Distributed resources with electric power systems.
[5] Mahrous Ahmed, three phase three level voltage source inverter with three phase two level as main circuit, Faculty of Engineering University of Egypt
[6] N Chayawatto dkk. 2015. Distributed Generation: Study on Converter Modelling on PV grid connected system under islanding phenomena. Clean Energy System,Thailand
[7] PTPLN(Persero), Pedoman Penyambungan Pembangkit Listrik Energi Terbarukan ke sistem distribusi PLN, Keputusan Direksi PLN, Juli 2014
[8] PT PLN(Persero), SPLN D5.004-1 : 2012, Power Quality (Regulasi harmonisa, Flicker dan ketidakseimbangan tegangan), 2012