Perencanaan Pembangkit Listrik Tenaga Surya Di Pos Pengamatan Gunung Soputan

Main Article Content

Novi Gusti Pahiyanti
Sigit Sumakajati
Axl Brian Androcles Tangkilisan

Abstract

This planning is carried out on the basis to meet the electricity needs that must continuously deliver electricity at the observation point of Mount Soputan, this is because electricity needs are very important in seeing the movement of the volcano. This plan with a planned load of 18.04 kWh. For such loading, 20 solar panels with 200 Wp capacity are used, and 2 solar panels controllers (SCC) are used, with each SCC used for 10 solar panels. As for the batteries used as many as 3 pieces with each battery having an energy of 2.4 kWh, then for the inverter using an inverter with a power of 2650 W.

Downloads

Download data is not yet available.

Article Details

How to Cite
Pahiyanti, N. G., Sumakajati, S., & Tangkilisan, A. B. A. (2019). Perencanaan Pembangkit Listrik Tenaga Surya Di Pos Pengamatan Gunung Soputan. KILAT, 8(2), 190–198. https://doi.org/10.33322/kilat.v8i2.651
Section
Articles

Most read articles by the same author(s)