Evaluasi Tingkat Keandalan Sistem Distribusi 20 kV Menggunakan Indeks SAIDI SAIFI

Main Article Content

Nurmiati Pasra
Samsurizal Samsurizal
Muh Fajri

Abstract

Reliability describes the proportion of service level when power is delivered from the system to the customer. PT. PLN (Persero) UP3 Biak still experiences frequent power outages due to fallen trees, animal activities such as snakes, and disturbances due to blackouts due to bad weather, which affects the reliability value. By using SAIDI and SAIFI to determine the level of reliability at PT. PLN (Persero) UP3 Biak, then based on the standards that have been determined by the Main Unit for the Papua and West Papua Regions with a SAIDI value of 10.11 hours/customer/year and SAIFI = 9.72 times/customer/year. For this reason, periodic maintenance is carried out such as tree removal, installation of fibers, installation of insulators and repair of SUTM and SUTR constructions. After the maintenance, the results showed that there was a change in the value of SAIDI and SAIFI, namely ULP Biak City, the value of SAIDI = 5.9 hours/customer and SAIFI = 4.98 times/customer with a percentage decrease of 87.6% and 88.8%, respectively. ULP Yumdori value SAIDI = 11.48 hours/customer and SAIFI = 5.97 times/customer with a percentage decrease of 90.1% and 94.3%, respectively. ULP Serui value SAIDI = 6.48 hours/customer and SAIFI = 3.79 times/customer with a percentage decrease of 83.4% and 86.9%. ULP Waropen value SAIDI = 0.77 hours/customer and SAIFI = 0.95 times/customer with a percentage decrease of 92.2% and 86%, respectively.

Downloads

Download data is not yet available.

Article Details

How to Cite
Pasra, N., Samsurizal, S., & Fajri, M. (2022). Evaluasi Tingkat Keandalan Sistem Distribusi 20 kV Menggunakan Indeks SAIDI SAIFI. SUTET, 12(1), 31–41. https://doi.org/10.33322/sutet.v12i1.1644
Section
Articles

References

[1] Aang Fras Setiawan. Titiek Suheta (2020). Analisa Studi Keandalan Sistem Distribusi 20 kV di PT. PLN (PERSERO) UPJ Mojokerto Menggunakan Metode FMEA (Failure
Mode Effect Analysis). Jurnal CYCLOTRON. 3. 11-17.
[2] Achmad Fatoni. Rony Seto Wibowo & Adi Soeprijanto (2016). Analisa Keandalan
Sistem Distribusi 20 kV PT.PLN Rayon Lumajang dengan Metode FMEA (Failure
Modes and Effects Analysis). Jurnal Teknik ITS. 5. B-462 – B-466.
[3] Engelberth. Tigor (2012). Analisis Keandalan System Distribusi 20 kV di PT. PLN
(Persero) Area Jaringan Bali Selatan Dengan Menggunakan Metode FMEA.
Surabaya: ITS.
[4] Nita Nurdiana (2017). Studi Keandalan Sistem Distribusi 20 kV Gardu Induk Talang Ratu Palembang. Jurnal Ampere. 2. 24-30.
[5] Pulungan. Basrah. Dkk (2012). Keandalan Jaringan Tegangan Menengah 20 kV di
Wilayah Area Pelayanan Jaringan (APJ) Padang PT PLN (Persero) Cabang Padang.
Jurnal Nasional Teknik Elektro. 1. 1.
[6] Rizal A. Duyo (2020). Analisis Penyebab Gangguan Jaringan Pada Distribusi Listrik
Menggunakan Metode Fault Tree Analysis Di PT. PLN (Persero) Rayon Daya
Makassar. Vertex Elektro. 12. 2.
[7] Samsurizal, S., & Fadli, Y. (2021). Relokasi Recloser Dengan Metode Section Technique Pada Jaringan Distribusi 20 kV. SUTET, 11(1), 13 - 24. https://doi.org/10.33322/sutet.v11i1.1328
[8] SPLN 59. 1985. Keandalan Pada Sistem Distribusi 20 KV dan 6 KV. Jakarta: Perusahaan Umum Listrik Negara.
[9] Samsurizal, S., & Hadinoto, B. (2020). Studi Analisis Dampak Overload Transformator Terhadap Kualitas Daya Di PT. PLN (Persero) Up3 Pondok Gede. KILAT, 9(1), 136-142.
[10] Syahmi Nanzain. Tri Wrahatnolo (2017). Evaluasi Keandalan Sistem Jaringan Distribusi 20 kV Menggunakan Metode Reliability Network Equivalent Approach (RNEA) di PT. PLN Rayon Mojokerto. Jurnal Teknik Elektro. 6. 111 – 119.
[11] Teguh Arfianto. Wahyu Agung Purbandoko (2018). Studi Keandalan Sistem Jaringan Distribusi 20 kV Dari Gangguan Faktor Alam di PT. PLN (PERSERO) Rayon Cimahi Selatan. Jurnal PROtek. 5. 72 – 75.

Most read articles by the same author(s)

1 2 > >>