PENYEIMBANGAN BEBAN PADA JARINGAN TEGANGAN RENDAH GARDU DISTRIBUSI CD 33 PENYULANG SAWAH DI PT PLN (PERSERO) AREA BINTARO

Main Article Content

Syarif Hidayat
Supridi Legino
Nurun Fatihah Mulyanti

Abstract

The Power Distribution System is basically a process for delivering electricity from a 150 kV power transmission system to a consumer, either 20 kV consumer or a 380/220 V consumer. The more complex distribution system of the network is the Low Voltage distribution system (380 / 220V), because the network of low voltage distribution system has a very wide network coverage. This often causes the Low Voltage Distribution system to be unbalanced, since household customers generally utilize single phase power. The effects of an unbalanced low voltage distribution system will affect many things, such as : the transformer's performance, excess heat in the overload phase, the current flowing in the neutral wire, the end-tension drop in the overload load network. And ultimately the quality of electricity at the consumer level decreases. With this load imbalance, the workable solution is to balance the load on the transformer. The measurements of Jurusan B after load balancing are the R-phase 106 Ampere, the S-phase 108 Ampere, and the T-phase 107 Ampere. The load unbalance value drops to 1% after a load balancing effort, this value is far below the maximum imbalance criterion of 10%.

Downloads

Download data is not yet available.

Article Details

How to Cite
Hidayat, S., Legino, S., & Mulyanti, N. F. (2019). PENYEIMBANGAN BEBAN PADA JARINGAN TEGANGAN RENDAH GARDU DISTRIBUSI CD 33 PENYULANG SAWAH DI PT PLN (PERSERO) AREA BINTARO. SUTET, 8(1), 21–27. https://doi.org/10.33322/sutet.v8i1.712
Section
Articles